Africa Suffers From A Lack of International Support For Transaqua Water Project

Nigeria’s Water Minister, Suleiman Hussein Adamau (Courtesy of The Guardian)

As reported in The Guardian, on January 14, My regrets as water minister, Nigeria’s Water Resources Minister, Suleiman Adamu, regretted that all efforts by Nigerian President Buhari to get international support for the Lake Chad Inter-Basin Water Transfer, known as Transaqua, failed despite its importance.

The Transaqua water project is an inter-basin water transfer infrastructure project to refurbish the shrinking Lake Chad. This “Pan African” grand design to transport water, via a gravity canal, from the ultra moist Great Lakes Region to the arid Lake Chad Basin, would have a transformative effect on the African continent. Read: Save Lake Chad With Transaqua: Franklin Roosevelt and Kwame Nkrumah Would Concure.

According to The Guardian article, the project was designed to provide water to Maiduguri and a large part of North East region for irrigation and water supply for the next 50 years. Minister Adamu is quoted: Unfortunately, the Russia-Ukraine war diverted the attention of the international community from matters of socio-economic development.

Minister Adamu, along with Nigerian President, Muhammadu Buhari, is a strong supporter of Transaqua. Read: Nigerian Water Minister Promotes Transaqua–A Water Project to Save Lake Chad & Transform Africa

As the most well-known American advocate and authority on Transaqua, and a collaborator of Minister Adamu for Transaqua, I can say definitively: the failure to proceed with the Transaqua project is a great loss to the entire continent of Africa.  

Lawrence Freeman addressing the International Conference to Save Lake Chad in Abuja, Nigeria, Februrat 26-28, 2018

CGTN Africa, produced a two minute video that accurately describes the essential features Transaqua. Watch: Reviving Lake Chad with Transaqua. See transcription below

“…To revive one of Africa’s most important water bodies, Lake Chad. The Transaqua project was an ambitious initiative geared towards replenishing the waters of Lake Chad. It involved 12 countries working together to build a canal moving 100 billion cubic meters of water from the river Congo to the Lake every year. However, the project has yet to take off, nearly 30 years after it was conceptualized.” Then it switched to their correspondent:

“It has been over 30 years since engineers came up with an ambitious proposal to divert water from the Congo River basin to Lake Chad in central Africa to prevent the lake drying up. Since 1960, Lake Chad has shrunk to about 10 percent of its original size and the project was seen as a possible solution to the problem. The Transaqua project would involve 12 countries working together to build a 2400 km long canal to move about 100 billion cubic meters of water from the lake every year. Nigerian President Mohammed Buhari led the initiative, supported by countries that are members of the Lake Chad Basin Commission, namely Cameroon, Chad, Niger, Nigeria, Algeria, and Central Africa Republic. The canal was also intended to generate hydro-electricity at several points along its length. It was also seen as a solution to its security crisis caused by the Boko Haram insurgency. The project would help reduce conflicts over water and instability in the Lake Chad region. The estimated cost of the project was 50 billion USD, but the project has yet to come to fruition. The Democratic Republic of Congo has opposed the project and a section of French scientists say the large scale project could cause irreversible environmental damage.”

“The Transaqua project remains in this planning and feasibility study stage. Today, the Lake Chad basin supports more than 30 million people; this means that if it is actually accomplished, the Transaqua project will change the face of Africa, for better or for worse.”

Read my earlier posts:

Interview With Lawrence Freeman: The Time is Now For TRANSAQUA-to Save Lake Chad and Transform Africa

Italy and Buhari Keep Transaqua on the Agenda to Save the Shrinking Lake Chad

Lawrence Freeman is a Political-Economic Analyst for Africa, who has been involved in economic development policies for Africa for over 30 years. He is a teacher, writer, public speaker, and consultant on Africa. He is also the creator of the blog: lawrencefreemanafricaandtheworld.com. Mr. Freeman’s stated personal mission is; to eliminate poverty and hunger in Africa by applying the scientific economic principles of Alexander Hamilton

Nigerian Water Minister Promotes Transaqua–A Water Project to Save Lake Chad & Transform Africa

The drying up of Lake Chad would be catastrophic for Africa. The disappearance of this body of water in the Sahel would not only affect the tens of millions of Africans living on and around the lake and the nations of the Lake Chad Basin, but the entirety of the continent. The lake has shrunk over the last six decades to 90% of its original area of 25,000 square kilometers.

Suleiman Adamu, Nigeria’s Minister of Water Resources, under President Mahammadu Buhari, has called for recharging Lake Chad, as reported in environewsnigeria.com, (excerpted below). Although Minister Adamu does not mention its name, the transformative water infrastructure project to save Lake Chad that he refers to is, Transaqua. It was first proposed by engineer Marcello Vichi in 1980.

Transaqua, was adopted as the preferred solution to restore Lake Chad to its earlier size, at the International Conference to Save Lake Chad, held in Abuja, Nigeria from February 26-28, 2018. I was a prominent speaker at this conference. Read: The Time is Now For TRANSAQUA-to Save Lake Chad and Transform Africa,

Essentially, Dr. Vichi’s proposal called for constructing a 2,400 kilometer canal from the southeast section of the Democratic Republic of the Congo that would flow by gravity northwest to the Central African Republic. There, this navigable canal would connect to the Chari River, the primary contributor of water to Lake Chad. By utilizing a small percentage of water from the Congo River, this canal would conduit an up to one hundred billion cubic meters of water to refurbish Lake Chad. Through human intervention, water is being transferred from the moist Congo River Basin to the arid Lake Chad Basin.

Dr. Vichi recently wrote:

“TRANSAQUA is the only project capable of transforming about 25% of the surface of the African continent by producing agricultural and livestock products sufficient for the domestic market and for export; to stop the advance of the Sahara and save Lake Chad; to produce large production of hydroelectric energy in the heart of Africa with the possibility of industrialization of economic activities; to create a river and road axis of about 2400 km capable of activating a collateral road network for the development of all types of activities; and much more.

“It has been calculated that the TRANSAQUA project could produce in the heart of the African continent, around 30 billion kw/h per year using only 6-8% of the water of the Congo River subtracted from dispersion in the ocean.”

For more information on the transformative impact of Transaqua for Africa, read: Save Lake Chad With Transaqua: Franklin Roosevelt and Kwame Nkrumah Would Concur

U.S. Rebuffs Transaqua

Despite all the ballyhoo and so called concern on the effects of climate change on the African continent, the U.S. has done nothing to address the crippling conditions of poverty and lack of energy. United Nations Envoy, Linda Thomas-Greenfield, typifies the Biden Administration’s deeply flawed outlook when it comes to assisting Africa. Speaking at the UN Security Council  on October 12, Ambassador Greenfield laments the effects of hotter dryer weather in Africa including on Lake Chad, “…we’ve watched Lake Chad as it diminishes in size. And we all wonder when Lake Chad will be no more.”

What rubbish. There is no reason for Lake Chad to disappear. There is a solution. It is called Transaqua. The U.S. has shown zero interest in saving Lake Chad. For decades, I have been the lone American voice advocating vociferously for saving Lake Chad. As Minister Adamu discussed, all that is required to start the project is three million dollars for a feasibility study, which no U.S. government has ever considered. While tens of billions of dollars have been promised to fight climate change in Africa, a tiny fraction of those funds could be spent to initiate Transaqua, a project that can save the lake and transform almost a third of the continent of Africa. Why hasn’t the U.S. allocated this small amount of money for a feasibility study of Transaqua?

The U.S. rejects Transaqua because it rejects development. The U.S. refuses to build infrastructure in Africa, the single most crucial element to address Africa’s massive energy and transportation needs, and create economic growth. Since the death of President John Kennedy, the concept of development has vanished from our thinking-from our culture. For over half a century, American elected officials have failed to demonstrate even a modicum of understanding of how to assist African nations to develop into industrialized economies.

The author advocating for Transaqua at the United Nations, August 2019

Excerpts from remarks by Minister Adamu follow:

Nigeria’s Minister of Water Resources, Suleiman Adamu, has called for more funding and understanding from international partners to save the fast drying Lake Chad from disappearing totally.

Part of the plan to revive the Lake Chad includes inter-basin water transfer from the River Congo to the Chad Basin.

“Although we don’t need $50 billion for Lake Chad but, at least with that kind of fund, the inter-basin water transfer has another angle that you can create a roadway and canals for river navigation.

“You can create many dams and hydropower schemes that will benefit countries like the Central African Republic.

“We can even have a highway from Lagos to Nairobi to Mombasa, from West Coast to the East Coast. It’s all part of the grand plan. But these things, you have to take those systematically.

“So, now we’re waiting to sign the MoU with the AfDB, So, once we’re able to sign that, we hope that we can get some funding, about 2 million to 3 million dollars to do the feasibility study,” Adamu said.

“We had a successful conference in February 2018. In that conference, we achieved two things.

“Number one, we achieved consensus. There is an international consensus, not only an African consensus, an international consensus that the Lake Chad has to be saved.

“Secondly, the consensus we had among us African countries was that the inter-basin water transfer should be given a shot at as the best way for the long term sustainability of the lake,” Adamu said.

“I’m worried that in the next 50 years we may wake up one day and there’s no Lake Chad,” the minister warned.

Read the entire article: Nigerian Minister Calls for International Funding to Revive Lake Chad

Read my earlier posts:

United Nations Conference: The Lake Chad Basin Should not be ‘Managed’; it Should be ‘Transformed.’

Water Transfer With Transaqua Will Bring Peace & Development to Lake Chad Basin

Lawrence Freeman is a Political-Economic Analyst for Africa, who has been involved in economic development policies for Africa for over 30 years. He is a teacher, writer, public speaker, and consultant on Africa. He is also the creator of the blog: lawrencefreemanafricaandtheworld.com. Mr. Freeman’s stated personal mission is; to eliminate poverty and hunger in Africa by applying the scientific economic principles of Alexander Hamilton

Nigeria Working to Save Lake Chad. Russia Powering Africa With Nuclear Energy

Proposed Transaqua Navigable Canal to Refurbish Lake Chad in blue

May 20, 2019

Nigerian Water Minister Adamu’s ‘Battle To Reclaim Lake Chad’

May 16, The {Daily Trust} of Nigeria has published an article on the efforts by  Nigeria’s Water Minister Suleiman Adamu for the inter-basin water transfer to reverse the shrinking Lake Chad with Transaqua.

“Perhaps, the most cheering moves by the present administration in the last three years in the water sector is the renewed interest to save the drying Lake Chad,” says the article, reporting that Adamu organized the International Conference on Lake Chad, Feb. 26-28, 2018 in Abuja.

“Experts at the conference, including the United Nation Educational, Scientific and Cultural Organization (UNESCO) agreed with the position of the Federal Government of Nigeria that it was time to find workable solution to recharge the drying Lake, which they said had depleted from its original size.

“One of the workable solutions suggested at the conference was to transfer water from the Congo Basin to the Lake Chad Basin [Transaqua, ed.], which Nigeria’s water minister says is technically feasible based on earlier studies conducted by a Chinese company, PowerChina….”

“Experts agreed that transferring water from Congo Basin down to the Lake Chad is a herculean task that requires huge money and time and thus its impact cannot be felt immediately,” the article says, quoting some engineers who say feasibility studies might take years. This is the view of those who put the cart before the horse, and want to first see whether the color of flamingos will be affected or if rare species of snakes would be threatened, before proving the technical feasibility of the project.

However, as concerns financing, “Hope rises recently, when the United Nations Secretary-General Antonio Guterres agreed to help raise $50 billion for a project to help raise $50 billion for a project to help revive the drought-stricken Lake. President Muhammad Buhari was said to have written to the UN scribe to co-chair the fundraising session with him and his acceptance response was delivered by the President of the African Development Bank, Dr. Akinwumi Adesina in Abuja. With this many believe that if the current efforts to reclaim the lake are sustained or intensified, glory days lie ahead.”

Read entire article

Nigeria’s President Buhari Continues Organizing Support for Transaqua

Nigerian President Muhammadu Buhari won the support from the President of the 73rd session of the United Nations General Assembly (UNGA), Maria Fernanda Espinosa Garcés, for the “inter-basin water transfer” to save Lake Chad, the technical name for the Transaqua project. Meeting Espinosa in Abuja, May 7, Buhari “stressed the role the international community needed to play in the endeavor, since recharging the lake was beyond the financial power of the affected countries,” says a statement issued by Buhari’s spokesman Femi Adesina.

In a separate meeting with Espinosa, Nigerian Foreign Minister Geoffrey Onyeama said: “We are looking to have the support of the UN and your support in particular, to address this challenge. One of the mechanisms we have identified is to recharge the Lake and it is going to be capital intensive efforts and something in the order of $40-$50 billion estimated and clearly, we are going to leverage on the international community because this is a huge resources and we look for your support.”

On her side, the UNGA President Espinosa, a native of Ecuador, said:  “It is a huge thing. And as a geographer, I can tell you. When I look at the map of Lake Chad and that in less than 40 years, this lake went from 24,000 something to 2,000 square kilometers, I have concluded that this is one of the major climate change disasters in this continent.

“So, that is a very touching example of how we need to tackle development and security together.  President Muhammadu Buhari has told us also that  there is no peace and security without development and there is no development without peace,” she said.

President Buhari had described the combined effect of the impoverishment and terrorism in the Lake Chad region. “The condition of internally displaced persons (IDPs) in the country is pathetic. We have at least a million children who neither know their parents nor where they come from.”  Damage to infrastructure, particularly in the Northeast, has been horrendous: “Bridges have been blown up, schools, hospitals, churches, mosques, and other buildings have been destroyed. All these will be rehabilitated, and every form of international help is welcome.”

Russia’s Growing Involvement in Africa’s Nuclear Power Projects

In an article in OilPrice.com today, Vanand Meliksetian, an energy and utilities consultant, points out the growing Russian interest in Africa’s energy development in general, and in establishing nuclear power in Africa in particular.

After showing that energy poverty is a significant problem in Africa in holding back its economic potential, he writes: “Russia’s energy industry, in comparison, is booming. Its state-run nuclear energy company Rosatom has an order book of 34 reactors in 12 countries worth $300 billion. Recently, Moscow has set its eyes on Africa where most states have either already struck a deal with the Kremlin or are considering one.”

The lack of access to a reliable and affordable source of energy is a severe impediment to Africa’s economic development. Also, Africa is urbanizing much faster than the rest of the world. African cities are expanding by 8% every year compared to 2% globally — which puts even more pressure on the existing energy systems.

In view of this development, Russia is keen to offer nuclear power to the African countries by working out deals which would allow them to adopt nuclear power. “The Russian deal is particularly appealing to countries lacking nuclear know how, due to Moscow’s comprehensive offers regarding financing, construction, and operation of the facilities. Currently, Rosatom is experimenting with a contract known as build-own-operate, under which ownership of the plant remains in Russian hands while energy is sold to the host country. This new type of contract is appealing to several African states which lack the means to finance construction.

Nigerian Water Minister, Suleiman Adamu, Announces Conference to Replenish Lake Chad and Several Hydro-Electric Projects

UNESCO Backs Campaign to Save Lake Chad

November 11, 2017 Nigeria’s Water Minister Suleiman Adamu announced that UNESCO is backing an international campaign to save Lake Chad from drying up. UNESCO is sponsoring an international conference in February in the Nigerian capital of Abuja, where the solution advocated by Nigeria and by the Lake Chad Basin Committee will be presented.

            Adamu said that the commission had proposed inter-basin water transfer from Congo Basin to the evaporating lake as a measure of saving it from total extinction. “This is a huge infrastructure project that will change the dynamics of the region and it is a long- term project with a lot of consensus to build on, as well as diplomatic issues having to do with different countries,” Adamu said according to PM News Nigeria media outlet.

            “We therefore need to do a lot of advocacy to make the members of the Congo Basin understand that we are not taking away their water but taking only 5% of the natural resource to keep the Lake Chad alive,” he said. “We hope that at the end of the conference in February next year, we will have an international consensus on what to do, leverage on and how to get a lot of resources and funding.”

            Adamu, who was attending a UNESCO General Conference in Paris, said that they considered the inter-basin water transfer as the most suitable option, but that they would not, however, insist on it, and “allow the UNESCO experts to advise on any cheaper available alternatives, if any,” as PM News reported. Adamu told PM News that the initial study on the project costed the water transfer project at $14 billion.

            “We have a 60,000 hectares irrigation scheme under the South-Chad Irrigation scheme, which was designed to depend on intake of water from the Lake Chad to irrigate the 60,000 hectares for the production of wheat. That irrigation scheme is not working now because the water is not available. We need the water to revive that investment. All the efforts the administration had been making to boost food production and reduce food imports stands to benefit if the Lake Chad is revived,” he said.

            Adamu said that a lot of other economic activities would be revived and the general livelihood of the people in the area would improve with the revival of the lake.  The lake, on which the lives of 30 million people depend, is bordered by Nigeria, Cameroon, Chad, and Niger; it has shrunk by 90%. “Clearly, the major factor of the Boko Haram insurgency is that there are lots of young people that are living in that area without any opportunity whatsoever because of the shrinking lake. Herdsmen had been forced to move southward and eastward and you can see that crises are getting increased between farmers and herdsmen,” he said.

Federal Government of Nigeria to complete 21 other dams, irrigation projects by 2019

Grace Obike, The Nation, Abuja, November 11, 2017

Apart from the Gurara hydropower plant, Kashimbila hydropower plant, Gurara II, Lokoja and Dasin hausa, which has either been completed, about to be completed or in talks with potential investors. The Federal Government is poised to complete seven other ongoing water supply projects and twenty one dams and irrigation projects between 2018 and 2019.

FG is also in advanced discussions with potential investors for the Gurara II, Lokoja and Dasin hausa hydropower projects, which when completed will produce a combined 1,250MW electricity to the national grid. Minister of Water Resources, Engr. Suleiman Adamu made this disclosure in Abuja, while presenting the two years score card of his ministry. He added that at his resumption of office, his ministry agreed to prioritize the 116 uncompleted or abandoned major projects he had met and deploy resources towards completing and commissioning all high and medium priority projects from 2016 to 2019.

His words.” We have concluded a Technical Audit and prioritized. the hitherto uncompleted or abandoned 116 major projects that I met in the Ministry. We are deploying most of our resources towards completing and commissioning all the high and medium priority projects from 2016 – 2019. It is in this regard that we have completed and commissioned Central Ogbia Regional Water Supply Project in Bayelsa State. It is also my pleasure to inform this gathering that the following projects have also been completed and are ready for commissioning: “Northern Ishan Regional Water Supply Project, Edo State.

 We have concluded a Technical Audit and prioritized. the hitherto uncompleted or abandoned 116 major projects that I met in the Ministry. We are deploying most of our resources towards completing and commissioning all the high and medium priority projects from 2016 – 2019. It is in this regard that we have completed and commissioned Central Ogbia Regional Water Supply Project in Bayelsa State. It is also my pleasure to inform this gathering that the following projects have also been completed and are ready for commissioning: “Northern Ishan Regional Water Supply Project, Edo State rehabilitation of Ojirami Dam Water Supply Project, Edo State. Kashimbiia Dam, Taraba State. Ogwashi-Uku Dam, Delta State. “Two (2) other projects: Shagari and Barikin Ladi Irrigation Projects will be completed in early 2018.

Our plan is to complete 7 other ongoing Water Supply Projects and 21 Dam and Irrigation Projects between 2018 and 2019, including the following: Water Supply Projects, Inyishi Water Supply Project, Ekeremor Water Supply Project, Sabke/Dutsi/Mashi Water Supply Projects, Zobe Water Supply Project, Mangu Water Supply Project. “Dam & Irritation Projects. Middle Ogun Irrigation Project, Middle Rima Valley Irrigation Project, Gari Irrigation Project, Kontagora Auna Dam Project, Bagwai Irrigation Project,Tada Shonga Irrigation Project, Adani Rice Irrigation Project, Ekuku Dam Project, Lower Anambra Irrigation Project, Ile-Ife Dam Project, Zauro Polder Irrigation Project and Otukpo Multipurpose Dam Project. ” Our Roadmap identified Dams with Hydro Power potential for Development and we have been in collaboration with the Federal Ministry of Works, Power and Housing (FMWPH) to that effect. “We are currently making progress for the concessioning of the 30MW Gurara Hydropower plant which is planned to come into full operation by mid 2018. We are also progressing on our collaboration with FMWPH to concession the 40MW Kashimbila Hydropower Plant recently completed. In addition, we are in advanced discussions with potential investors for other hydropower projects including Gurara II (350MW), Lokoja (750MW) and Basin Hausa (150MW).

“With 1,800m3/Capita/year of available renewable water resources, Nigeria is not a water poor country.

“The Ministry has also championed the signing of an MOU between the Lake Chad Basin Commission and a Chinese company, who are presently undertaking further feasibility study on the proposed Interbasin Water Transfer Project from the Congo River into the Lake Chad. Furthermore, in an effort to arrive at the best solution in saving the Lake Chad, an International Conference on the Lake is now scheduled to hold in Abuja from 26th -28tln February, 2018 in collaboration with LCBC and UNESCO. “In addition, the Ministry has completed the engineering design and is set to commence in 2018 the Hawal InterBasin Transfer from River Hawal to River Ngadda. Phase 1 of the project is to augment water supply to Alau Dam so as to provide more sustainable source of water supply to Maiduguri and environs. Phase 2 of the project aims to resuscitate the 60,000Ha South Chad Irrigation Scheme, which became moribund following continuous drying up of Lake Chad over the years.”